devildog
Well-Known Member
I have been working on using the RS method with Wild Edge steps and also using them for my platform and after practicing in my yard I have no issues getting 2 steps on the tree for a platform, but getting a third step at the same height can be very challenging, any hints or tricks to putting on the third step. My method now is putting the step to the right on first then the one to the left and to try to do the 3rd in the middle of the tree.