I’m working on dialing in a JRB setup using the LHA hitch and Garda footloop, and I’ve got a couple questions about my anchor setup.
I’m wanting to preset paracord loops in the tree and then use my rappel rope to cinch/girth hitch into those loops once I get it up there.
Question 1:
What knot would you recommend tying on the end of my rappel rope so it interfaces cleanly with those preset loops and cinches down securely on the limb/tree?
Question 2:
I’ll also be using a “Maverick” pole for setting anchors when needed. I plan to use a Bloodgood hitch when doing that. Has anyone found a good way to run the same rope for both setups?
Any suggestions or setups that have worked well for you?
Appreciate any help.
I’m wanting to preset paracord loops in the tree and then use my rappel rope to cinch/girth hitch into those loops once I get it up there.
Question 1:
What knot would you recommend tying on the end of my rappel rope so it interfaces cleanly with those preset loops and cinches down securely on the limb/tree?
Question 2:
I’ll also be using a “Maverick” pole for setting anchors when needed. I plan to use a Bloodgood hitch when doing that. Has anyone found a good way to run the same rope for both setups?
Any suggestions or setups that have worked well for you?
Appreciate any help.