So im venturing into splicing finally tired of bulky ropes for bridges. I have 100 feet of amsteel got a sick deal from a friend!!
Im looking to make a 28” bridge (finished length). Just need to know if my calculations are on point.
28” bridge
Plus 8” for the loops
Plus a 10” bury
This gives me 64” or roughly 5.33 ft for a total starting piece. Anyone see something that i am missing??
Im looking to make a 28” bridge (finished length). Just need to know if my calculations are on point.
28” bridge
Plus 8” for the loops
Plus a 10” bury
This gives me 64” or roughly 5.33 ft for a total starting piece. Anyone see something that i am missing??