Concrete is mostly done, original joists arent able to be levelled correctly so we sistered all of them at the correct level, layer of ply under, insulation then layer of ply subfloor on top. Half done with the room, doing the other half of the floor and finish fixing the exterior door tomorrow while I still have help (had to remove and reframe it a bit higher due to correcting the floor height). My dad is 68 and he's been kicking my butt/huge help getting this part of the project done. Impressive dude.
View attachment 102798
Then I just need to build doors to close in the crawlspace/storage area, rip out the rest of the drywall and replace it and the (inadequate) insulation in the walls, get outlets and lights installed and this phase of the project is done.
Next phase is taking out the wall (left of the photo next to the door) in between this space and my kitchen, should be fun since it's a load bearing wall so some temp walls and big beam header (maybe steel?) will be involved. Then I can renovate the combined spaces into a bigger/nicer kitchen. Whew. Going to take a while, but it'll be nice when it's finished.