Like said above there is nothing wrong with sewn loops. I think one major benefit to go with sewn eyes for a manufacturer is being able to use rope that’s available. That way when a rope is unavailable you can just grab something else that is the right color and climbing spec. No backorders on account of rope availability.Anyone have any thoughts on the sewn loops (tether and linemans ropes) in the pic vs spliced loops like Tethrd uses?